COMMERCIAL PROJECTS
|
|
Village
Center One
Big Sky, Montana
Allied provided
surveying, geotechnical engineering, civil site
design, water and sewer services, storm drain design and
extensive grading and drainage design for Big Sky Resort's
Village Center One. This project was done in challenging
terrain and geotechnical conditions.
This four-story building
offers innovative slopeside work/play entertainment
suites. The pedestrian plaza level features approximately
10,000 square feet of retail and restaurant space. Village
Center One opened in 2007.
|
|
|
Skier
Bridges, Yellowstone Development, LLC
Big Sky, Montana
Allied Engineering Services,
Inc. worked with the Yellowstone Club to provide structural
design and grade separation between vehicular access to residences
and skiers accessing lifts. The grade separations were provided
by a series of four bridges. Several provided for vehicles
to pass over the skier paths while the others routed skiers
over the road.
The crossing locations proved
to be challenging for designing bridges with steep grades,
sharp skew angles and existing ski lift locations. In several
locations the result was massive abutments and wing walls
to retain the large earth embankments. Steel beams and a
concrete deck were chosen for longevity and structural capacity.
Snow grooming equipment and vehicles as well as skiers will
be using the bridges.
Due to the location within
an upscale residential community, aesthetics were a major
consideration for these structures. To accommodate the demand
for bridges that fit with the setting, the design incorporated
stone facing for all walls and abutments. Project completion
date was 2003.
|
|
|
Hillcrest
Retirement Center
Bozeman, Montana
Aspen Point at Hillcrest is a large assisted living / retirement community with state-of-the-art health care facilities for its senior residents. The Hillcrest facilities are located on a 7.03 acre campus with a 68,000 sq. ft. building footprint situated between the previously existing facility and a major pre-existing transmission water main.
The site and grading designs had to provide for adequate depth of burial for the pre-existing water mains as well as protect the integrity of the existing structure while maintaining an ease of use for the elderly residents. Allied Engineering
provided complete civil site design as well as geotechnical engineering, surveying and staking, materials testing, and construction inspection for this project. Careful foundation design and construction oversight allowed the project to be completed using shallow foundations bearing on structural fill and the lightly cemented Tertiary sediments present at the site. Allied also designed the grading and drainage, retaining walls, and water and sewer main extensions.
|
|
|
Genesis
Business Park Subdivision
Bozeman, Montana
Genesis Business Park Subdivision home to such
businesses as Right Now Technologies, Allied Engineering
and Spire Climbing Gym is a 27 lot commercial subdivision
that features community water and wastewater systems and a reconstructed creek
channel with two large ponds that serve as an on-site source of water for structural
fire protection.
Allied Engineering designed
approximately 2500 lf of sewer main, 2300 lf of water main,
pumping facilities, Ultraviolet (UV) disinfection of water
and wastewater systems, recirculating sand filter, roads,
and earthwork. Allied also provided the civil site design,
surveying and construction inspection. The project completed
in 2000 received strong endorsements from both the City
Planners and Gallatin County Commissioners.
|
|
|
|
|
|
|